Safety                                              

FLATpak™’s versatility makes it the ideal solution for a wide range of operations. While it can be  modified to encapsulate virtually anything, traditional coil units can still deploy it with multiple points of well control.

Revolutionary Design

CJS FLATpak™ features an innovative rectangular matrix design, encapsulating multiple coiled tubing strings or electrical conduits into one uniform body using a high strength thermoplastic jacket.

Versatile

FLATpak™’s versatility makes it the ideal solution for a wide range of operations.

 

A History of Success

Since commercialization, CJS has worked with many top-tier companies to install hundreds of thousands of feet of FLATpak™.

Testimonial

“I like the product. Running the FLATpak™ is simple, like running one string, not three. It's cheap and easy and non-complicated.”

Darrell Eagles - Production Engineer, Devon Energy

 

Quantum/CJS JetPak/JetVak

View Quantum Website

This innovative system takes advantage of the robustness and proven advantages of the Source Rock Energy Modified Jet Pump combined with the CJS FLATpak. The cleanout jet pump assembly is run on the FLATpak string, using one side for power fluid injection and the other side for fluid returns. The jet pump is equipped with a nozzle/throat configuration which will be optimized for the candidate wells.

 

The intake of the pump has a screen to allow appropriately sized solids to be produced, but will prevent oversized particles from clogging the pump. Also incorporated is a combination back-pressure valve / nozzle which acts as a forward jet if sand bridges are encountered which prevent normal forward advancement of the jet pump assembly. When pressurized by pumping down both FLATpak strings, the valve will open and the tool will jet forward into the sand bridge. Once the sand bridge is broken, jet pumping can resume, and the fluid and sand can be produced to surface.

Benefits:

  • Eliminates choking effects of velocity strings.
  •  

  • Eliminates liquid hydrostatic suppression of production
  •  

  • Achieves greater formation pressure draw down.
  •  

  • Can achieve near dry gas flow.
  •  

  • Significantly increases recoverable reserves by lowering the water saturation of the producing formation.
  •  

  • Jet Pump may be used to clean wells after frac jobs.
  •  

  • Constant monitoring of formation pressure and performance optimization using JJTech proprietary software.
  •  

  • High solids content of produced formation liquids can be handled efficiently and economically.
  •